• 4222 South Staples Street • Corpus Christi Texas 78411 USA
Wire and Film Technologies Division
Telephone: 361 992 7900 • Facsimile: 361 992 3377 • Website: www.irctt.com
Note 1: Package volume excludes external
terminals (balls, bumps, lands, leads) and/or
non-integral heat sinks.
Note 2: The maximum component temperature
reached during refl ow depends on package
thickness and volume. The use of convection
refl ow processess reduces the thermal gradients
between packages. However, thermal gradients
due to differences in thermal mass of SMD pack-
ages may still exist.
Note 3: Components intended for use in “lead-
free” assembly process shall be evaluated using
the “lead-free” peak temperature and profi les
defi ned in Table 1, 2 and refl ow profi le whether
or not lead-free.
Tabel 1: SnPb Eutectic Process -
Package Peak Refl ow Temperatures
Package
Thickness Volume mm3 < 350 Volume mm3 ≥ 350
< 2.5 mm 240 +0/-5°C 225 +0/-5°C
≥ 2.5 mm 225 +0/-5°C 225 +0/-5°C
Tabel 2: Pb-free Process -
Package Peak Refl ow Temperatures
Package
Thickness
Volume mm3
< 350
Volume mm3
350 - 2000
Volume mm3
> 2000
< 1.6 mm 260°C * 260°C * 260°C *
1.6 mm - 2.5 mm 260°C * 250°C * 245°C *
≥ 2.5 mm 250°C * 245°C * 245°C *
* Tolerance: The device manufacturer/supplier shall assure process compat-
ibility up to and including the stated classifi cation temperature at the rated MSL
level.
Note 1: All temperatures refer
to topside of the package,
measured on the package
body surface.
Note 2: Time within 5 °C of
actual peak temperature (tp)
specifi ed for the refl ow profi les
is a “supplier” minimum and a
“user” maximum.
Profi le Feature Sn-Pb Eutectic
Assembly Pb-Free
Assembly
Average Ramp-up rate (Tsmax to Tp) 3°C / second max. 3°C / second max.
Preheat
- Temperature Min (Tsmin)
- Temperature Max (Tsmax)
- Time (Tsmin to Tsmax) (ts)
100°C
150°C
60 -120 seconds
150°C
200°C
60 -180 seconds
Time maintained above
- Temperature (TL)
- Time (tL)
183°C
60 - 150 seconds
217°C
60 - 150 seconds
Peak Temperature (TP) See Table 1 See Table 2
Time within 5°C of actual Peak Temperature (tp)210 - 30 seconds 20 - 40 seconds
Ramp-down Rate 6°C / second max. 6°C / second max.
Time 25°C to Peak Temperature 6 minutes max. 8 minutes max.
Sn-Pb Eutectic and Pb-Free Reflow Profiles
Time
Temperature
Critical Zone
TL to TP
Ramp-down
Ramp-up
t 25°C to Peak
TP
TL
Tsmax
Tsmin
ts
Preheat
tL
25
tP
* Based on Industry Standards and IPC recommendations
IRC Solder Refl ow Recommendations
HSF
High Surge Film
Surface Mount Metal GlazeTM
HSF-1 Series Issue October 2010 Sheet 3 of 4