DEFENSE SUPPLY CENTER COLUMBUS
COLUMBUS, OHIO 43216-5000
4. QUALITY ASSURANCE PROVISIONS
. For device classes Q and V, sampling and inspection procedures shall be in accordance w ith MIL-
PRF-38535 or as modified in the device manufacturer's Quality Management (QM) plan. T he modi
fication in the QM plan shall not
affect the form, fit, or function as described herein. For device class M, sampling and inspection procedures shall be in accor
with MIL-PRF-38535, appendix A.
. For device classes Q and V, screening shall be in accord
ance with MIL-PRF-38535, and shall be conducted on
all devices prior to qualification and technology conformance inspection. For device class M, screening shall be in accor
method 5004 of MIL-STD-883, and shall be conducted on all devices prior to quality conformance inspection.
Additional criteria for device class M
the sequence specified as initial (preburn-in) electrical parameters through interim (postburn-in) electrical
parameters of method 5004 and substitute lines 1 through 6 of table IIA herein.
to burn-in, the devices shall be programmed (see 4.5.2 herein) with a checkerboard pattern or equivalent
(manufacturers at their option may employ an equiv a
lent pattern provided it is a topologically true alternating bit pattern).
The pattern shall be read before and after burn-in. Dev ices hav ing bits not in the proper state after bur
a device failure and shall be included in the PDA calculation and shall be removed from the lot.
circuit shall be maintained by the manufacturer under document revision level control and shall be made av ailable
he preparing or acquiring activity upon request. The test circuit shall specify the inputs, outputs, biases, and power
dissipation, as applicable, in accordance with the intent specified in test method 1015.
Dynamic burn-in (method 1015 of MIL-STD-883, test condition D; for circuit, see 4.2.1c herein).
Interim and final electrical parameters shall be as specified in table IIA herein.
After the completion of all screening, the device shall be erased and verified prior to delivery.
Additional criteria for device classes Q and V
The burn-in test duration, test condition and test temperature, o
r approved alternatives shall be as specified in the device
manufacturer's QM plan in accordance w ith MIL-PRF-38535. T he burn-in test circuit shall b
e maintained under document
level control of the device manufacturer's Technology Review Board (TRB) in accordance with MIL-PRF-38535
e made available to the acquiring or preparing activity upon request. The test circuit shall specify the inputs,
outputs, biases, and power dissipation, as applicable, in acc
ordance with the intent specified in test method 1015 of MIL-
Interim and final electrical test parameters shall be as specified in table IIA herein.
Additional screening for device class V beyond t
he requirements of device class Q shall be as specified in appendix B of
Qualification inspection for device classes Q and V
. Qualification inspection for device classes Q and V shall be in
accordance with MIL-PRF-38535.
Inspections to be performed shall be those specified in MIL-PRF-38535 and herein for groups
A, B, C, D, and E inspections (see 4.4.1 through 4.4.4).
. Technology conformance inspection for classes Q and V shall be in accordance with MIL-PRF-
including groups A, B, C, D, and E inspections and as specified herein.
Quality conformance inspection for device class
M shall be in accordance with M IL-PR F-38535, appendix
A and as specified herein. Inspections to be performed for device class
M shall be those specified in method 5005 of MIL-ST D- 883 and herein for groups A,
B, C, D, and E inspections (see 4.4.1 through