3M™Scotch-Weld™
Epo xy Adhesives
D P-100 Clear • DP-100 NS T ranslucent
- 3 -
Handling/Curing
Information 1. For optimum strength structural bonds, paint, oxide f ilms, oils, dust, mold release
agents and all other surface contaminants must be completely remo v ed. However , the
amount of surface preparation directly depends on the required bond strength and the
environmental aging resistance desired by user. For specif ic surf ace preparations on
common substrates, see the follo wing section on Surf ace Preparation.
2. Use gloves to minimize skin contact with adhesive.
3. These products consist of two parts.
Mixing and A pplying
F or Duo-P ak Cartridges - 50 ml
3M™ Scotch-Weld™ DP-100 and DP-100 NS Adhesi v es are suppled in a dual syringe
plastic Duo-Pak cartridge as part of the 3M™ Scotch-Weld™ EPX™ Applicator system.
To use, simply insert the Duo-Pak cartridge into the EPX applicator and start the plunger
into the cylinders using light pressure on the trigger. Next, remove the Duo-Pak cartridge
cap and expel a small amount of adhesive to be sure both sides of the Duo-Pak cartridge
are flo wing evenly and freely. If mixing of Part A and P art B is desired, attach the EPX
mixing nozzle to the Duo-Pak cartridge and begin dispensing the adhesive. For hand
mixing, expel the desired amount of adhesive and mix thoroughly. Mix approximately
15 seconds after uniform color is obtained.
F or Duo-P ak Cartridges - 200/400 ml
Directions for Use: While holding cartridge in an upright position, remov e insert from
Duo-Pak cartridge by unscrewing plastic nut. Detach metal remov al disc from insert to
free plastic nut for nozzle attachment. Clear orifices if necessary. Attach mixing nozzle
and secure with plastic nut. Place cartridge into EPX Applicator. Dispense a small
quantity of adhesi v e to assure both components are dispensing equally. Apply adhesive
to clean surfaces, join parts, secure until set up (20 minutes @ 75°F [24°C]). Lea ve
nozzle attached to store. Replace nozzle after storage.
F or Bulk Containers
Mix thoroughly by weight or volume in the proportions specified in the Typical Uncured
Properties section. Mix approximately 15 seconds after uniform color is obtained.
4. For maximum bond strength apply adhesive e venly to both surfaces to be joined.
5. Application to the substrates should be make within 5 minutes. Lar ger quantities
and/or higher temperatures will reduce this working time.
6. Join the adhesi v e coated surf aces and allow to cure at 60°F (16°C) or abov e until
completely firm. Heat, up to 200°F (93°C), will speed curing. These products will
fully cure in 24-48 hours @ 75°F (24°C).
7. K eep parts from mo ving during cure. Contact pressure is necessary. Maximum shear
strength is obtained with a 3-5 mil bond line.
8. Excess uncured adhesi v e can be cleaned up with k etone type solvents.*
*Note: When using solvents, e xtinguish all ignition sources and follow the
manufacturer’s precautions and directions for use.
Adhesive Co v erage: A 0.005 in. thick bondline will typically yield a cov erage of
320 sq. ft./gallon.